The line will stand out due to its high degree of automation and resource-saving processes and will be equipped, in addition to a horizontal Drever annealing furnace and a multi-stage pickling section, with a four-high skin-pass mill stand and a side trimmer. The new annealing and pickling line will be the fourth one SMS group is going to install at Aperam’s Genk site.
Besides mechanical equipment, process technology, furnace technology, electrical and automation systems, the scope of supply will also include technical support during installation and commissioning. The line will process both austenitic and ferritic grades.