SMS group engineers found the right technological formula to fit the new furnace into the existing, confined space and reuse the existing equipment as much as possible in order to meet the customer’s budget requirements. According to the tight schedule of this turnkey project, production is to start twelve months from contract signing. The fact that Forjas Iraeta Heavy Industry has again chosen SMS equipment is proof of SMS group’s reliability in brown field projects.
The project includes the latest of technical solutions to handle the wide range of products and meet the customer’s requirements in terms of fuel consumption, pollutants emission and furnace operation. SMS group will be responsible for integrating the new furnace into the existing rolling equipment and automation system, and will modify the existing water treatment plant to meet the new requirements of the new furnace.