At a hight of roughly 4000m, the weather conditions are extreme, marked by permanent frost and strong wind. This poses high demands to the quality of the employed material. As well as the extra thick panels developed by 3S particularly for this project, the Multi-Contact elements are characterized by durability and a long lifespan, and thus ideally suited for the use in this environment.
The installation is a pioneer project by the Zermatt Bergbahnen AG and the sol-E Suisse AG, and is unique in Europe.