Contact
QR code for the current URL

Story Box-ID: 1004631

Swiss Resource Capital AG Poststrasse 1 9100 Herisau, Switzerland http://www.resource-capital.ch
Contact Mr Jochen Staiger +41 71 354 85 01

GoldMining announces resource Estimate for the Yarumalito gold projekt in Colombia

(PresseBox) (Vancouver, British Columbia, )
.

Highlights:

- Maiden inferred resource estimate for the Yarumalito Project of 1.24 Moz gold grading 0.58 g/t gold and 0.09% copper or 1.5 Moz gold equivalent grading 0.70 g/t gold equivalent (Table 1);
- The estimate furthers GoldMining's unique position of holding one of the largest global resource-stage gold portfolios among mid- and junior-tier mining companies;
- Yarumalito is GoldMining's third acquisition in the Mid Cauca Belt of central Colombia, which also hosts several multi-million ounce gold deposits owned by Zijin Mining, B2Gold and Anglogold Ashanti; and
- GoldMining's global aggregated mineral resource (Fig.1 and Table 2) now totals:

o 10.5 Moz gold (13.4 Moz gold equivalent) in the measured and indicated categories; and
o 13.7 Moz gold (16.4 Moz gold equivalent) in the inferred category.

GoldMining Inc. (the "Company" or "GoldMining") (TSX: GOLD; OTCQX: GLDLF - https://www.commodity-tv.com/play/goldmining-acquisition-of-almaden-gold-stocks-still-undervalued/ ) is pleased to announce that it has completed a maiden mineral resource estimate for its 100% owned Yarumalito Gold-Copper Project (the "Yarumalito" or the "Project"), Antioquia, Colombia.

The mineral resource estimate was prepared by Global Mineral Resource Services of Vancouver, Canada and includes a pit constrained inferred resource of 66,271,000 tonnes grading 0.58 g/t gold (1,236,000 ounces) and 0.09% copper (129,262,000 pounds) or 0.70 g/t gold equivalent (1,502,000 ounces) using a 0.5 g/t gold equivalent cut-off.  See Table 1 below for information regarding the resource estimate.

Garnet Dawson, CEO of GoldMining, commented, "We are excited to announce this maiden resource for Yarumalito – another strategic acquisition our team identified and executed as part of our long-term plans of focused acquisitions in the Americas.  These acquisitions have uniquely positioned us with one of the largest global resource-stage gold portfolios among mid- and junior-tier mining companies.  While this has been a cornerstone of our strategy since inception, we see significant value in this position in the current environment of recent gold price improvements and decreasing worldwide gold discoveries.

Yarumalito is located within the same Miocene age gold belt that hosts advance-stage multi-million ounce gold deposits owned by Zijin Mining, B2Gold and Anglogold Ashanti; mineralization hosted on these projects is not necessarily indicative of the future mining potential of the Project.  Historic drilling at Yarumalito focused on delineating its gold-copper porphyry potential, however, in addition to intersecting long intervals of gold-copper mineralization, the drilling also intersected numerous high-grade, precious metal-rich base metal epithermal veins such as 33.75 g/t gold over 1.85 m intersected in drill hole YAR-11.  Future exploration programs will look to expand and upgrade the gold-copper porphyry mineralization at the Project, which remains open along strike and at depth, and to delineate the high-grade epithermal veins."

The Project

Yarumalito is located approximately 75 km southwest of the city of Medellin in the Department of Antioquia in Central Colombia and approximately 40 km south of GoldMining's La Mina Project.  The Project is accessible by paved road with nearby high-capacity power lines, water and labour.  Yarumalito is comprised of one concession for a total area of approximately 1,453 Ha. 

Exploration programs from 2008 to 2013 outlined several geophysical and geochemical anomalies across the property including the Obispo, La Suiza, Balastreras, Escuela, El Guaico and El Sucre targets.  Diamond drill programs (18,540 m in 55 holes) during that period primarily focused on the Balastreras-Escuela mineralization, which has a surface projection of approximately 1,700 m by 400 m and is intersected in drill holes and underground workings to a depth of 600 m.

Resource Estimate

The following table sets forth the mineral resource estimate for Yarumalito.

Table 1: Inferred resource statement1 using a 0.5 g/t gold equivalent cut-off for the Yarumalito Gold-Copper Project, Colombia, Global Mineral Resource Services.

The Yarumalito deposit was modelled on a series of north-south cross-sections spaced 100 m apart from which a three-dimensional wireframe model was constructed for the mineralized zone at an approximate grade boundary of 0.1 g/t gold.  Diamond drill holes (50) totaling approximately 16,635 m were used to define the model.  High-grade gold values were capped at 9 g/t gold with 12 assays falling above this value.  Assay sample lengths were composited at 5.0 m.  Gold, copper and gold equivalent grades were interpolated into the block model in a single pass using inverse distance square weighting.  Individual blocks within the model measure 5 x 20 x 25 m in dimension.  For a grade to be interpolated into a block it was necessary that a minimum of two and a maximum of four composites be located within the volume of the search ellipse.  A maximum of one composite was allowed per drill hole to ensure that each block was informed by a minimum of two drill holes.  Average bulk density of 2.3 and 2.7 g/cm3 were used to convert block model volumes to tonnages for oxides and sulphides, respectively.  Gold equivalent grades were calculated based on the following formula:

AuEq = ((Au ppm*48.2) + (Cu ppm*0.006))/48.2

where 41.8 equals US$/gram for gold based on a gold price of US$1,500/ounce and 0.006 equals US$/ppm for copper based on a copper price of US$2.70/pound.  No allowance was made for metallurgical recoveries.  

The block model was validated in three ways: (i) visual comparison of block values with underlying drill hole composite values; (ii) comparison of descriptive statistics for the gold and copper block values with assay and composite values, and (iii) swath plots of gold equivalent composites, gold equivalent block grades and modeled tonnage.

Resources were classified as inferred because the drilling is relatively widely spaced and there has been limited metallurgical testwork.  Additional infill drilling and metallurgical test work would be required to confirm grade continuity and metallurgical recoveries, respectively to potentially upgrade the existing resource to indicated or measured categories.   

Reasonable prospects for eventual economic extraction were determined by reporting the resource within a conceptual pit shell.  The conceptual pit delineated resource is reported within a pit shell using an assumed gold price of US$1,500/oz, copper price of US$2.70/lb, pit slope of 45º, mining cost of US$2.00/t and processing cost of US$8.00/t.

Further details regarding the foregoing estimate, including the estimation methods and procedures, will be available in a Canadian National Instrument 43-101 Technical Report, which will be filed on SEDAR (www.sedar.com) under the Company's profile within 45 days of the date hereof.

Quality Control – Quality Assurance Program

The above resource estimate was based on drilling programs completed by previous operators.  The drill programs incorporated control samples including blanks, duplicates 

and standards as part of their Quality Control – Quality Assurance Program.  The control samples from the drill programs have been reviewed and verified by the Qualified Persons (as defined herein) and the assay results were deemed suitable for resource estimation.

Qualified Persons

The resource estimate disclosed herein on Yarumalito was prepared for GoldMining by Greg Z. Mosher, M.Sc., P.Geo., of Global Mineral Resource Services, Vancouver, Canada.  Mr. Mosher is recognized as a qualified person as defined in Canadian National Instrument 43-101, is independent of the Company and has reviewed and approved the disclosure regarding the resource estimate herein.  Mr. Mosher completed a site visit to Yarumalito on November 14 to 15, 2019.

Paulo Pereira, President of GoldMining Inc. has reviewed and approved the technical information contained in this news release.  Mr. Pereira holds a Bachelors degree in Geology from Universidade do Amazonas in Brazil, is a Qualified Person as defined in NI 43-101 and is a member of the Association of Professional Geoscientists of Ontario.

Note on Mineral Resource Estimates

Inferred mineral resources have a great amount of uncertainty as to their existence and great uncertainty as to their economic and legal feasibility.  It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category.  Under applicable Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre-feasibility studies.  It cannot be assumed that part or all of an inferred mineral resource will be upgraded to a mineral reserve.

The terms “mineral resource”, “measured mineral resource”, “indicated mineral resource”, “inferred mineral resource” used herein are Canadian mining terms used in accordance with NI 43-101 under the guidelines set out in the Canadian Institute of Mining and Metallurgy and Petroleum (the “CIM”) Standards on Mineral Resources and Mineral Reserves, adopted by the CIM Council, as may be amended from time to time.  These definitions differ from the definitions in the United States Securities & Exchange Commission (“SEC”) Industry Guide 7.  As such, information contained herein concerning descriptions of mineralization and resources under Canadian standards may not be comparable to similar information made public by U.S. companies in SEC filings.

About GoldMining Inc.

GoldMining Inc. is a public mineral exploration company focused on the acquisition and development of gold assets in the Americas.  Through its disciplined acquisition strategy, GoldMining now controls a diversified portfolio of resource-stage gold and gold-copper projects in Canada, U.S.A., Brazil, Colombia and Peru.  Additionally, GoldMining owns a 75% interest in the Rea Uranium Project, located in the Western Athabasca Basin of Alberta, Canada.

The above aggregated resource statement is provided for information purposes only.   Investors should refer to the underlying technical reports referenced above for project-specific factors relating to each resource estimate.

Forward-looking Statements

This document contains certain forward-looking statements that reflect the current views and/or expectations of GoldMining with respect to its business and future events, including expectations and future plans respecting the Project and any future exploration programs and other work on the Project.  Forward-looking statements are based on the then-current expectations, beliefs, assumptions, estimates and forecasts about the business and the markets in which GoldMining operates, including that historical exploration results will be confirmed.  Investors are cautioned that all forward-looking statements involve risks and uncertainties, including: the inherent risks involved in the exploration and development of mineral properties, the uncertainties involved in interpreting drill results and other exploration data, the potential for delays in exploration or development activities, the geology, grade and continuity of mineral deposits, the possibility that future exploration, development or mining results will not be consistent with GoldMiningꞌs expectations, accidents, equipment breakdowns, title and permitting matters, labour disputes or other unanticipated difficulties with or interruptions in operations, fluctuating metal prices, unanticipated costs and expenses,  and uncertainties relating to the availability and costs of financing needed in the future.  These risks, as well as others, including those set forth in GoldMiningꞌs Annual Information Form for the year ended November 30, 2019 and other filings with Canadian securities regulators, could cause actual results and events to vary significantly.  Accordingly, readers should not place undue reliance on forward-looking statements and information.  There can be no assurance that forward-looking information, or the material factors or assumptions used to develop such forward looking information, will prove to be accurate.  GoldMining does not undertake any obligations to release publicly any revisions for updating any voluntary forward-looking statements, except as required by applicable securities law.

1Mineral resources are not mineral reserves and do not have demonstrated economic viability.  There is no certainty that all or any part of the mineral resources will be converted into mineral reserves.  The estimate of mineral resources may be materially affected by environmental permitting, legal, title, taxation, sociopolitical, marketing or other relevant issues.

Website Promotion

Website Promotion
The publisher indicated in each case (see company info by clicking on image/title or company info in the right-hand column) is solely responsible for the stories above, the event or job offer shown and for the image and audio material displayed. As a rule, the publisher is also the author of the texts and the attached image, audio and information material. The use of information published here is generally free of charge for personal information and editorial processing. Please clarify any copyright issues with the stated publisher before further use. In case of publication, please send a specimen copy to service@pressebox.de.
Important note:

Systematic data storage as well as the use of even parts of this database are only permitted with the written consent of unn | UNITED NEWS NETWORK GmbH.

unn | UNITED NEWS NETWORK GmbH 2002–2024, All rights reserved

The publisher indicated in each case (see company info by clicking on image/title or company info in the right-hand column) is solely responsible for the stories above, the event or job offer shown and for the image and audio material displayed. As a rule, the publisher is also the author of the texts and the attached image, audio and information material. The use of information published here is generally free of charge for personal information and editorial processing. Please clarify any copyright issues with the stated publisher before further use. In case of publication, please send a specimen copy to service@pressebox.de.