Contact
QR code for the current URL

Story Box-ID: 1221556

Swiss Resource Capital AG Poststrasse 1 9100 Herisau, Switzerland http://www.resource-capital.ch
Contact Mr Marc Ollinger +41 71 354 85 01

Green Bridge Metals geophysical surveys and channel sampling identifies clear drill targets at the Chrome Puddy Project, Ontario

(PresseBox) (Vancouver, Canada, )
Green Bridge Metals Corporation (CSE: GRBM, OTCQB: GBMCF, FWB: J48, WKN: A3EW4S) ("Green Bridge" or the "Company") - https://www.commodity-tv.com/ondemand/companies/profil/green-bridge-metals-corp/ - is pleased to announce encouraging results from a VTEMTM Plus airborne geophysical survey and channel sampling program at its Chrome Puddy nickel project, located 180 km north of Thunder Bay, Ontario. Channel sampling results show very consistent bulk tonnage nickel mineralization associated with oxide alteration and veining. Channel results included 110.4 m at 2,270 ppm Ni, 11.8% Fe, and 119 ppm Co at the Commerce East and 55.5 m at 2,521 ppm Ni and 4.6% Fe at the Commerce West Occurrences. These lengths are limited only by exposed outcrop and mineralization remains open along the length of both channels. In addition to nickel, Chrome Puddy contains Fe, Cr and Co adding potential additional value to the nickel mineralization.

The channel sampling results and nickel mineralization encountered in historical drilling (1965, 1994) correlate with two well developed discrete conductors identified by the Company’s recent airborne Geotech VTEMTM Plus geophysical program conducted over the property (Figure 1).  Importantly, it appears that only the margins of these conductors have been drill tested historically with the Company planning a diamond drilling program to test the strongest portions of the conductors with the aim of identifying higher-grade mineralization.

A Message from David Suda, CEO of Green Bridge Metals

Green Bridge is excited to drill test these highly prospective bulk-tonnage nickel targets that are defined by the recent VTEM airborne survey and sampling efforts. We are very encouraged by the scale of the conductivity anomalies, and the fact that historical work only tested the margins of the target. Current sampling has clearly validated the presence of wide intervals of nickel mineralization that was indicated by historical efforts. The exploration target at Puddy has unique nickel-oxide mineralization that is potentially readily amenable to extraction by simple processing technologies.

Summary of Geophysical Survey

In July 2024, Geotech Ltd. performed an airborne electromagnetic (EM) using the VTEMTM Plus (versatile time-domain electromagnetic) system. A total of 235-line kilometers were flown at a spacing of 100 meters with a predominant north-south orientation. The survey has provided two clear distinct conductors as drill targets that are associated with nickel mineralization both within the channel samples and/or historical drilling.  The southern conductor is over 2 kilometers long and over 500 meters wide and is associated with channel samples of 110 m of 0.23% nickel (Table 1) and historical drilling of 122.6 m of 0.25% nickel (Table 2). In addition, a separate discrete conductor has been identified to the north of Puddy Lake that is approximately 1.0 kilometers in length by 200 m in width. This conductor remains largely untested by historical drilling with the exception of a drill hole that was 76 m of 0.12% nickel that was located on the western-most margin of the conductor. Collectively, these two conductors provide clear drill targets with the Company currently conducting 3D inversions of the VTEM survey to aid in designing an upcoming drill program. 

Summary of Sampling Program

 A total of 181 sawn channel samples representing 181.9 m of channel sampling were analyzed from 3 known surface showings of Ni-Fe-Co oxide mineralization at Puddy lake, Thunder Bay Mining Division, NW Ontario. Sampling was done at the Commerce East Occurrence (110.4 m) on claims 282629 and 290692, the Commerce West Occurrence (55.5 m) on claim 106245 and the Commerce Far West Occurrence (16.0 m) on claim 282627.

The average assay value of the channel samples is 2,326 ppm Ni with a high value of 3,370 ppm Ni. The Puddy serpentinite has high Fe contents with the average of all channels being 9.2% Fe and a high value of 36.1% Fe. Cobalt averages 100 ppm with a high value of 508 ppm Co. Locally anomalous PGM values up to 224 ppb Pt with 54 ppb Pd were determined at the Commerce East location. 

QA/QC - Channel samples were obtained with a gas-powered portable rock saw with a diamond blade after removing loose surface rubble with shovel and power washing. Sawn channel samples nominally 1.0 m in length were analyzed by sodium peroxide fusion with inductively coupled plasma/mass spectrometry (ICPMS) analysis for multi-elements and fire assay with inductively coupled plasma/optical emission spectrometry (ICP/OES) analysis for Au, Pt, Pd at Activation Laboratories Ltd. (Actlabs) located in Ancaster, Ontario. A QA/QC program was implemented using 7 duplicates, 7 blanks and 6 CDN-ME-2001 CRMs. Surface samples are continuous channel samples and are selective insofar as they sample available outcrop.

All scientific and technical information, and written disclosure in this news release has been prepared by, or approved by Ajeet Milliard, Ph.D., CPG, Chief Geologist for Green Bridge Metals and a qualified person (QP) for the purposes of National Instrument 43-101 - Standards of Disclosure for Mineral Projects.

About Green Bridge Metals

Green Bridge Metals Corporation (formerly Mich Resources Ltd.) is a Canadian based exploration company focused on acquiring ‘battery metal’ rich mineral assets and the development of the Chrome Puddy property (the “Property”). The Property contains bulk-tonnage nickel and nickel-PGM mineralization hosted in mafic intrusions. The Property has exploration targets for bulk-tonnage Ni mineralization and high grade Ni-PGE mineralization.

Forward Looking Information

Certain statements and information herein, including all statements that are not historical facts, contain forward-looking statements and forward-looking information within the meaning of applicable securities laws. Such forward-looking statements or information include but are not limited to statements or information with respect to: results from the VTEMTM Plus airborne geophysical survey and channel sampling program at the Chrome Puddy nickel project; potential additional value to the nickel mineralization at Chrome Puddy; and the exploration and development of the Chrome Puddy nickel project.

Although management of the Company believe that the assumptions made and the expectations represented by such statements or information are reasonable, there can be no assurance that forward-looking statements or information herein will prove to be accurate. Forward-looking statements and information by their nature are based on assumptions and involve known and unknown risks, uncertainties and other factors which may cause actual results, performance or achievements, or industry results, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information. These risk factors include, but are not limited to: the exploration and development of the Chrome Puddy nickel project may not result in any commercially successful outcome for the Company; risks associated with the business of the Company; business and economic conditions in the mining industry generally; changes in general economic conditions or conditions in the financial markets; changes in laws (including regulations respecting mining concessions); and other risk factors as detailed from time to time.

The Company does not undertake to update any forward-looking information, except in accordance with applicable securities laws.

Certain figures and references contain information supported by public and corporate references that may have been updated, changed, or modified since their referenced date.

Website Promotion

Website Promotion
The publisher indicated in each case (see company info by clicking on image/title or company info in the right-hand column) is solely responsible for the stories above, the event or job offer shown and for the image and audio material displayed. As a rule, the publisher is also the author of the texts and the attached image, audio and information material. The use of information published here is generally free of charge for personal information and editorial processing. Please clarify any copyright issues with the stated publisher before further use. In case of publication, please send a specimen copy to service@pressebox.de.
Important note:

Systematic data storage as well as the use of even parts of this database are only permitted with the written consent of unn | UNITED NEWS NETWORK GmbH.

unn | UNITED NEWS NETWORK GmbH 2002–2024, All rights reserved

The publisher indicated in each case (see company info by clicking on image/title or company info in the right-hand column) is solely responsible for the stories above, the event or job offer shown and for the image and audio material displayed. As a rule, the publisher is also the author of the texts and the attached image, audio and information material. The use of information published here is generally free of charge for personal information and editorial processing. Please clarify any copyright issues with the stated publisher before further use. In case of publication, please send a specimen copy to service@pressebox.de.