Maple Gold is currently drilling one of these high-priority extension targets on the southeast edge of the Porphyry Zone with a fence of three (3) drill-holes that will aim to extend the higher-grade mineralization beyond the current resource model. This drilling will build on previous intercepts of 4.08 g/t Au (uncut) over 28m from 82m, including 8.4 g/t Au over 11m in hole DO-11-61, as well as 2.33 g/t Au (uncut) over 24.4m from 120.4m in hole D93-16 (all lengths are down the hole).
Maple Gold’s President & CEO, Matthew Hornor, stated: “Our team spent significant time generating drill targets during the back half of 2017. Now that we received our final permit last week, we are ramping up and moving drill rigs to our most exciting targets. Drill results will be announced in batches as drilling is completed on specific target areas so our shareholders can follow the progress of our various objectives.”
Qualified Person
The scientific and technical data contained in this press release was reviewed and prepared under the supervision of Fred Speidel, M. Sc, P. Geo., Vice-President Exploration, of Maple Gold. Mr. Speidel is a Qualified Person under National Instrument 43-101 Standards of Disclosure for Mineral Projects. Mr. Speidel has verified the data related to the exploration information disclosed in this news release through his direct participation in the work.
NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS PRESS RELEASE.
Forward Looking Statements:
This news release contains “forward-looking information" and “forward-looking statements” (collectively referred to as “forward-looking statements”) within the meaning of applicable Canadian securities legislation in Canada. Forward-looking statements are based on assumptions, uncertainties and management’s best estimate of future events. Actual events or results could differ materially from the Company’s expectations and projections. Investors are cautioned that forward-looking statements involve risks and uncertainties. Accordingly, readers should not place undue reliance on forward-looking statements. Forward-looking statements include, but are not limited to, statements with respect to the mineral resource estimate, including statements regarding contained ounces, optimal cut-off grade and average gold grade, as well as statements regarding upcoming exploration programs. When used herein, words such as “anticipate”, “will”, “intend” and similar expressions are intended to identify forward-looking statements.
Forward-looking statements are based on certain estimates, expectations, analysis and opinions that management believed reasonable at the time they were made or in certain cases, on third party expert opinions. Such forward-looking statements involve known and unknown risks, and uncertainties and other factors that may cause our actual events, results, performance or achievements to be materially different from any future events, results, performance, or achievements expressed or implied by such forward-looking statements. For a more detailed discussion of such risks and other factors that could cause actual results to differ materially from those expressed or implied by such forward-looking statements, refer to Maple Gold Mines Ltd.’s filings with Canadian securities regulators available on www.sedar.com or the Company’s website at www.maplegoldmines.com. The Company does not intend, and expressly disclaims any intention or obligation to, update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as required by law.